The largest and most modern biogas plant in Europe is being built in Friesoythe – and it is still being expanded.
An exciting project, which is characterized above all by its challenges and the good cooperation with all parties involved. PURIngenieur is supporting this project in various areas, including the detailed engineering of the pipeline, the 3D planning of the isometrics and the approval planning.
In the next few weeks we will post more information about the project – at this point we refer you to the video for a first impression and have summarized a few hard facts for you:

Facts:

  • Facility area: 13.5 hectares
  • 20 fermenters, each with a volume of 10,000 cubic meters
  • Processing approximately 120 trucks of solid manure per day
  • Energy production: 680 gigawatt hours per year
  • Planning scope: approx. 20km of pipeline
  • Steel weight of the pipe route: 400 tons